Six disciplines.
One integrated production system.

From a back-of-napkin sketch to a serial-production line, we own every step. Vertically integrated, horizontally trustworthy.

/ 01 — Manufacturing

Industrial Manufacturing

High-volume production with statistical process control, dedicated cells, and full PPAP-level documentation. Run sizes from 5K to 5M parts per year.

High-volumeSPCPPAP
/ 02 — Engineering

Precision Engineering

5-axis CNC, wire and sinker EDM, ID/OD grinding, hard turning. Tolerances to ±2µm on critical features. AS9100 and ISO 13485 qualified cells.

5-axis CNCEDM±2µm
/ 03 — Fabrication

Fabrication & Assembly

Multi-material TIG/MIG/laser welding, mechanical and adhesive assembly, leak and pressure testing — with end-to-end traceability per serial number.

WeldingTraceability
/ 04 — Automation

Automation Systems

Robotic work-cells, vision-guided pick-and-place, custom end-of-arm tooling, PLC and SCADA integration. Designed in-house, deployed worldwide.

RoboticsVisionPLC
/ 05 — OEM/ODM

OEM & ODM Solutions

From your CAD or ours. Concept feasibility, DFM/DFA, prototyping, validation builds, and serial production — under a single project lead.

DFMCo-engineer
/ 06 — Quality

Quality Inspection

CMM (Zeiss & Mitutoyo), 3D laser scanning, AI-driven visual inspection, and first-article certification. Every shipment lands with a full data pack.

CMMAI visionFAI
Process

From sketch to shipment — six stages, zero handoffs.

Every project moves through the same disciplined sequence. One project lead, six gates, full transparency.

01

Design

Concept review, feasibility, DFM/DFA, CAD lock.

02

Engineering

Process planning, tooling design, fixturing.

03

Production

Pilot run, SPC tuning, serial production.

04

Testing

CMM, vision QC, functional and pressure tests.

05

Packaging

Custom dunnage, anti-corrosion, kanban-ready.

06

Delivery

Global logistics, EDI integration, on-time KPI ≥ 99%.

Got a part that needs a real engineer to look at it?

Send us your drawing. We'll come back within 24 hours with a feasibility note, three improvement suggestions, and a price.

Send a drawing